Kabir Arora Book 30 min ↗
Kabir Arora/Writing/Systems thinking

Every fix has a second-order effect

GTM systems are connected. Speed up one stage and you can slow down another, so I write down what a change touches before I build it.

Systems thinking 3 min read Nov 2026 All writing

A system is its parts, the connections between them and the feedback loops. In GTM, the connections are where things go wrong.

Second- and third-order effects

Route every inbound lead to an AE within five minutes, and the AEs get flooded with low-fit leads. They start ignoring the alerts, and speed-to-lead goes down. The fix is to score before routing and send low-fit leads to nurture.

Let an agent write a fit score into the CRM, and marketing builds an ad audience on it. Then the model drifts and ad spend shifts without anyone noticing. The fix is monitoring, versioned scores, and a list of everything downstream that reads the field.

Close the loop

Most GTM stacks are open-loop. Outcomes like replies, meetings, wins and losses never flow back into the scoring or the copy, so the system never learns. When I design a play, the measure and the path back are decided before the first send.

Fix the bottleneck, not the stage you like

Improving a stage that isn't the bottleneck does nothing. Early at Lastmile we kept building lists while none of our first 50 target companies had been approved, and the launch was two weeks late. More lists wouldn't have helped. We stopped, fixed the approval step and the offer, and only then added volume.

Prefer builds that compound

I prefer work whose value compounds:

  • it serves every future lead, not one list;
  • it creates reusable data, like a title dictionary or a company cache;
  • it feeds other systems, so routing logs become attribution, and attribution improves scoring.

My test for any request: will this still be paying off in six months, and does anything else get better because it exists?

Write the one-pager first

Before I build a system, I write one page:

  • the problem and the metric it moves, with today's number;
  • who uses the output and who owns the rules;
  • the inputs, the steps and the outputs;
  • which fields it reads and writes, and which system owns each;
  • where AI is used and why;
  • how it fails, and what catches the failure;
  • what it costs per run and per outcome;
  • what's monitored, and who gets alerted;
  • how it rolls out, and how it rolls back.

It takes an hour and saves weeks.

Report in their metric

Sellers care about time saved and better leads. Marketing cares about attribution it can defend. Customer success cares about early warning. Finance cares about cost per outcome and capacity.

I ask what each team does today before proposing anything, ship small, publish the rules, and report impact in the metric they already watch. Documentation is part of the product. A system only I can run is a risk to the team.

Hiring a GTM engineer? Tell me what's breaking.

Kabir Arora · Lastmile GTM ↗Updated 24 Nov 2026